Table of Contents
ToggleExclusive Field Guide: 70 Essential Practical Tips from Real Plant Experience
If you are an Instrumentation Engineer, you already know small mistakes create big shutdowns.
These 70 field-tested tips will protect your plant, your instruments, and your reputation.
Let us go step by step.
Cable & Wiring Discipline
1. Separate Signal and Power Cables
Never run signal and power conductors in the same multi-core cable. Power cables generate electromagnetic noise that interferes with low-level instrument signals. This results in fluctuating readings and unnecessary troubleshooting.
2. Segregate Cable Types in Trays
Intrinsic safety, signal, and power cables must be routed in separate compartments. Mixing them increases interference risk and violates hazardous area compliance. Proper segregation improves system reliability.
3. Avoid Intermediate Cable Joints
Every intermediate joint is a potential failure point. Moisture ingress and loose connections usually start from joints. Always prefer single continuous cable runs.
4. Ground Shielding at One End Only
Ground cable shielding at the control room side only. Grounding at both ends creates ground loops and introduces noise. Single-point grounding ensures clean signal transmission.
5. Insulate Disconnected Wires During Maintenance
When disconnecting wires, immediately tape or cap them. Open ends can touch metal parts and create short circuits. Many panel faults occur during maintenance work.
6. Maintain Proper Cable Bend Radius
Cable bend radius must exceed 10 times the cable diameter. Sharp bends weaken insulation and conductor integrity. Fiber optic cables require even larger bend radius.
7. Verify Insulation Resistance Before Commissioning
Cable insulation resistance should exceed 5 megaohms. Low resistance indicates moisture or damage. Fixing it early prevents intermittent failures later.
8. Provide Proper Support at Entry Points
Cables entering panels must have fixed support points. Temperature changes cause expansion and contraction stress. Without support, terminal blocks loosen over time.
9. Provide Slope Toward Outside at Cable Entry
Maintain a slope greater than 1/100 toward outside. This prevents rainwater from entering control rooms. Water inside panels leads to catastrophic failures.
10. Seal Wall Penetrations Properly
Seal all cable entry holes. Rodents and insects can damage insulation silently. Many unexplained faults are caused by animal intrusion.
11. Label Every Wire Clearly
Clear labeling reduces troubleshooting time drastically. Future engineers may not know your wiring scheme. Good labeling prevents confusion and mistakes.
12. Keep Intrinsically Safe and Explosion-Proof Signals Separate
Never terminate them in the same junction box. Mixing classifications violates safety rules. Always maintain hazardous area integrity.
Hazardous Area & Safety Practices
13. Install Surge Protection in Lightning Areas
Lightning-induced surges can destroy transmitters instantly. Install surge protectors before connecting to barriers and DCS. Prevention is cheaper than replacement.
14. Use Dual Power Supplies for DCS
Redundant power ensures plant monitoring continues during failures. A single power supply is a single point of failure. Always design for reliability.
15. Avoid Copper in Ammonia Service
Copper reacts with ammonia and causes corrosion problems. Always verify material compatibility before installation. Incorrect materials shorten equipment life.
16. Use Copper-Free Instruments in Acetylene Applications
Check instrument marking carefully. Some devices are labeled “Not suitable for acetylene.” Never ignore compatibility warnings.
17. Ground Zener Barriers Correctly
Intrinsic safety depends heavily on proper grounding. High ground resistance defeats protection. Measure grounding resistance as per standards.
18. Implement Anti-Static Measures in DCS Rooms
Static discharge can damage electronic modules. Proper flooring and earthing reduce static buildup. Protect your control system from silent damage.
Installation Best Practices
19. Install Rotameters Vertically with Bottom-to-Top Flow
Incorrect orientation causes float sticking and inaccurate readings. Gravity must assist float movement. Always verify direction before commissioning.
20. Install Turbine and Rotor Flow Meters Correctly
Follow straight pipe length requirements. Flow disturbances reduce accuracy significantly. Never compromise installation rules.
21. Do Not Use Electromagnetic Flow Meters for Low Conductivity Media
These meters require conductive fluids. Using them in low conductivity service causes unstable signals. Always check media properties.
22. Use Mass Flow Meters for High Accuracy Applications
For billing or custody transfer, mass flow meters are preferred. They provide direct mass measurement without density correction. Accuracy justifies cost.
23. Add Cooling Siphon for Pressure Above 60°C
High temperature damages pressure transmitters. A siphon cools process fluid before reaching instrument. This increases instrument lifespan.
24. Maintain Equal Height of Steam Condensing Pots
Unequal heights create incorrect differential pressure readings. Steam measurement accuracy depends on this alignment. Always verify during installation.
25. Do Not Include Flow Elements in Hydro Test
Orifice plates and flow elements are not designed for hydro stress. Remove them before pressure testing. This prevents deformation.
26. Cold Bend Instrument Tubing
Avoid gas welding for bending tubes. Heat weakens metal strength. Cold bending maintains structural integrity.
27. Install Temperature Sensors Against Flow Direction
This improves measurement response. Incorrect positioning delays temperature sensing. Small positioning changes affect accuracy.
28. Use Expander for Small Pipe Temperature Installation
For pipes below DN80, increase pipe size locally. This ensures proper sensor immersion. Poor immersion reduces accuracy.
29. Install Pressure Tapping Upstream of Temperature Point
On same pipeline, pressure should be upstream. This prevents disturbed readings. Proper sequence ensures better data quality.
30. Use Minimum 12mm OD Pipe for Steam Tracing
Smaller pipes reduce tracing efficiency. Adequate diameter ensures consistent heating. Instrument lines remain functional in cold weather.
Control Valve & Process Awareness
31. Consider Flashing During Valve Selection
High pressure drop may cause flashing. Flashing damages valve trim rapidly. Select proper trim material and flow direction.
32. Reduce Cavitation Using Multi-Stage Pressure Reduction
Breaking pressure drop into stages reduces damage. Cavitation destroys valves quickly. Analyze process pressure profile carefully.
33. Vent Instrument Air Before Connecting to Positioner
Oil and moisture damage positioners. Always purge air lines first. Clean air ensures stable valve control.
34. Configure Air-to-Open and Air-to-Close Correctly
Wrong configuration leads to unsafe failure condition. Always verify fail-safe logic. Interlock systems depend on this setting.
35. Use Fail-Safe Solenoid Valves
Solenoids should de-energize during trips. This ensures safe shutdown. Always verify logic during commissioning.
36. Never Remove Solenoid Coil While Energized
Removing energized coil burns it instantly. Always isolate power first. Basic discipline prevents replacement cost.
Maintenance & Operational Discipline
37. Never Disassemble Live Equipment
Always verify isolation before touching terminals. Live work risks serious injury. Safety must be non-negotiable.
38. Carry a Test Pen
Never assume equipment is dead. Always confirm voltage absence. This habit prevents accidents.
39. Inform Process Team Before Maintenance
Instrumentation changes affect process conditions. Poor communication can trip plant. Always coordinate with operators.
40. Ensure Process Personnel Are Present During Critical Repairs
Unexpected process response can occur. Operator presence reduces risk. Teamwork prevents shutdown.
41. Follow Written Procedures During Production
Unauthorized changes create unsafe conditions. Always document and obtain approval. Procedure compliance protects everyone.
42. Test Alarm Devices Periodically
Alarms must function during emergencies. Non-functional alarms compromise safety. Routine testing ensures reliability.
43. Use Fireproof Cloth for Instrument Protection
Plastic bags melt in fire. Fireproof cloth provides better protection. Choose materials wisely.
44. Keep Oxygen Instruments Oil-Free
Oil contamination in oxygen systems can cause fire. Always segregate oxygen service instruments. Maintain strict cleanliness.
Temperature & Measurement Troubleshooting
45. Avoid Two-Wire RTD for Long Distance
Two-wire systems introduce lead resistance error. Use three or four-wire configuration. Accuracy improves significantly.
46. Sudden Maximum Temperature Reading Indicates Open Circuit
Broken thermocouple or RTD often causes full-scale reading. Always check continuity first. Fault diagnosis becomes easier.
47. Sudden Minimum Reading Indicates Short Circuit
Shorted sensor or wiring causes low reading. Inspect wiring carefully. Quick analysis saves downtime.
48. Do Not Use Lugs on Compensation Wires
Different metals create measurement error. Direct terminal connection is preferred. Maintain conductor compatibility.
Grounding & Electrical Integrity
49. Check Earthing Continuity Periodically
Ground failures are silent killers. Poor grounding causes unstable signals and safety hazards. Regular testing prevents hidden risks.
50. Maintain Work Grounding Below 1 Ohm
Proper grounding protects equipment and personnel. High resistance reduces protection effectiveness. Measure regularly.
51. Maintain Other Grounding Below 4 Ohms
Non-critical grounding must also meet limits. Good grounding reduces electrical noise. Stable grounding improves system performance.
Advanced Field Discipline
52. Verify Chloride Content During SS Hydro Testing
Chloride content must not exceed 25 PPM. Excess chloride causes stress corrosion cracking. Stainless steel requires careful handling.
53. Complete Individual Testing Before Installation
Bench testing avoids rework later. Fixing instrument at site wastes time. Pre-checking saves installation effort.
54. Perform Loop Testing Before Commissioning
Loop testing verifies wiring and signal continuity. It ensures correct mapping in DCS. Skipping loop test causes confusion later.
55. Use Isolators Between DCS and Electrical Systems
Isolation prevents electrical noise interference. It protects control systems from disturbances. Communication becomes stable.
56. Maintain Proper Spacing Between Instrument and Electrical Equipment
Close proximity increases electromagnetic interference. Proper spacing improves reliability. Layout discipline matters.
57. Drain Moisture from Instrument Air Lines Regularly
Water in air lines damages positioners. Corrosion reduces valve life. Regular draining maintains performance.
58. Install Instrument Air Valves Above Pipe Centerline
Debris settles at bottom of pipeline. Higher valve position prevents contamination. Clean air improves reliability.
59. Keep Rodents Out of Control Rooms
Rodents chew insulation silently. Small damage leads to intermittent faults. Prevention saves repeated troubleshooting.
60. Photograph Wiring Before Dismantling
Photos help during reinstallation. Memory fails during emergencies. Visual reference saves hours.
61. Use Torque Wrench for Terminal Tightening
Over-tightening damages terminals. Under-tightening causes heating and loose contact. Correct torque ensures long-term reliability.
62. Calibrate After Installation
Transport and handling affect calibration. Field verification ensures accuracy. Never skip final calibration.
63. Use Durable Identification Tags
Temporary markers fade with weather. Permanent tags ensure long-term traceability. Proper identification reduces confusion.
64. Keep Spare Cable Glands and Lugs Ready
Small items delay commissioning unnecessarily. Field readiness improves productivity. Planning avoids downtime.
65. Add Terminators Properly in Fieldbus Design
Install terminators at correct points. Incorrect termination causes communication failure. Always follow fieldbus design rules.
66. Do Not Use Flow Measurement Elements in Plant Water Testing
They are not pressure test components. Exposure may damage calibration. Protect them during hydro tests.
67. Use Forced Action Through DCS During Interlock Maintenance
Never bypass manually without control system coordination. Improper action creates unsafe condition. Always follow interlock logic.
68. Maintain Proper Isolation Between Enhanced Safety and Explosion-Proof Circuits
Mixing them violates compliance. Keep separation clear and documented. Safety classification must remain intact.
69. Understand That Instrumentation and Process Are Closely Linked
Instrumentation does not operate alone. Every change impacts process conditions. Think beyond wiring.
70. Remember the Golden Rule of Instrumentation Engineers
You are not just installing instruments. You are protecting safety, accuracy, and plant reliability. A disciplined Instrumentation Engineer prevents shutdown before it happens.
What we learn today?
Field experience teaches what books never will.
If you are an Instrumentation Engineer, your value is not just wiring and calibration.
Your value is in protecting safety, accuracy, and reliability of the entire process.
Save this guide. Share it with your junior engineers.
And most importantly apply it.
Because in instrumentation, small mistakes create big shutdowns.
I hope you like above blog. There is no cost associated in sharing the article in your social media. Thanks for Reading !! Happy Learning